The P200 is a platform robot with a top module to handle complex transport tasks in manufacturing facilities. A general-purpose I/O interface is implemented for integrating top modules and collaborative robots. It is equipped with a large capacity battery to support all-day operation of AMR and top modules. The P200 works with a variety of top modules and collaborative robots to solve production material transport tasks in warehouses, clean rooms and production lines.

■Multifunctionality

P200 places the external integration interface on the panel. Interfaces include GPIO, Ethernet, WLAN, power and auxiliary safety interfaces for cobot and top module integration, providing versatility with customized solutions. Through these, the top module can access the P200's IPC, PLC, and battery BMS, and the P200 can also manage the top module, making it compatible with a variety of application situations.

■Rational structural design

The P200 integration interface is located on the top panel. It also provides convenient integration that does not affect the P200's drive system or maintenance.

■Multi-system collaborative control

The P200 solution allows for connection with sensors, collaborative robots, PLCs, etc. There is no need to develop separate chassis to accommodate separate top modules. With P200, specific integration needs are met.

  • Product

    Robot platform series

Share this product


470+ people viewing

Last viewed: 21 hours ago


Free
Get started with our free quotation service - no cost, no obligation.

No Phone Required
We respect your privacy. You can receive quotes without sharing your phone number.

1 Models of Robot platform series

Image Part Number Price (excluding tax) Operating hours Size Integration Interface
Robot platform series-Part Number-P200

P200

Available upon quote

8h

1,016*652*290mm

Integration interface

Customers who viewed this product also viewed

Reviews shown here are reviews of companies.

See More Transport Robots Products

Other products of Youibot Robotics Co., Ltd.

Reviews shown here are reviews of companies.


View more products of Youibot Robotics Co., Ltd.

About Company Handling This Product

This is the version of our website addressed to speakers of English in the United States. If you are a resident of another country, please select the appropriate version of Metoree for your country in the drop-down menu.

Copyright © 2026 Metoree