Price (excluding tax)
■ Process ·undercoat ・ Topcoat ■ Adjustment adjustment ・ Dirty, dust, wrapped, fats and fats, etc., and the deteriorated old coat are sufficiently removed, and if the dirt is severe, wash with water for 24 hours or more. Leave it and check for drying. ・ The new concrete surface should be left behind (more than 3 weeks or more) until the pH 10 or less, the water content is 8%or less (about 3 weeks or more). ・ If the base is extremely rough or the irregularities, please make up with a fat mortar.
You can search for other models from each index. The displayed value is the value of the currently selected part number.
Application method
Applied amount (kg/ml2)
Construction area (M2)
Drying time (20 ° C RH65%)
Normal interpretation (%)
Packing
Primary color
Regular color
gloss
Part Number
IP Yoheki CourtHandling Company
Takase Painting Co., Ltd.Items marked with have different values depending on the model number.
Product Image | Price (excluding tax) | Application method | Applied amount (kg/ml2) | Construction area (M2) | Drying time (20 ° C RH65%) | Normal interpretation (%) | Packing | Primary color | Regular color | gloss |
---|---|---|---|---|---|---|---|---|---|---|
Available upon quote | Chooulorer | Undercoat: 0.25 ~ 0.30 Top coating: 0.25 ~ 0.25 | Undercoat + overcoat: 36 ~ 44ml / 20kg, 7 ~ 8m / 4kg | Undercoat: 3 hours or more | 3-7 | 20kg oil can, 4kg gallon can | 17 colors, target product setting primary colors, common color sample | white | matte |