About This Product

■Summary

Confirmation tests of main circuits and VCT circuits must be carried out during construction of power generation and substations, etc., and this device applies test voltage to the main circuit of power generation and substations, and performs comprehensive phase detection of the main circuit and VCT secondary circuit. It was developed and improved in 2004 and 2004 through commissioned research by Tohoku Electric Power Co., Inc.'s Yamagata Technical Center, with the aim of conducting accurate confirmation tests.

■Features

Conventional models of this device include the VCT circuit primary tester CVE-15 and the CT circuit primary tester CVE-20, which have the following features.

■Equipment integration

Previous models consisted of multiple units such as a power supply and a resistance box, but in this device the resistance box is built into the lid of the main unit, and is separated when in use and integrated when stored.

■Reducing the weight of the device

In order to reduce the weight of the device, the resistor used especially in the secondary side test was made as small as 0.1Ω, and the power transformer capacity was minimized.

■Simplification of operation

The test voltage can be selected using a push button switch.

■Labor saving in testing

Built-in voltage, current, and phase meters save labor during testing.In particular, the phase meter measures primary side (power supply) voltage R-N, S-N, T-N, R-S, S-T, T-R and secondary side current R, S, T. You can display the phase of any combination of 0 to 360° (delayed phase is positive).

■Suitable for both primary and secondary side tests

There are two methods for confirmation testing of the main circuit and VCT circuit: applying a test voltage from the primary side of the transformer (primary side test) and applying test voltage from the secondary side of the transformer (secondary side test). This device is compatible with both (see Figures 1 and 2).

  • Product

    Power generation and substation main circuit primary energization test equipment CVE-22

Share this product


130+ people viewing

Last viewed: 17 hours ago


Free
Get started with our free quotation service - no cost, no obligation.

No Phone Required
We respect your privacy. You can receive quotes without sharing your phone number.

1 Models of Power generation and substation main circuit primary energization test equipment CVE-22

Image Part Number Price (excluding tax) Ammeter Voltmeter Phase meter Secondary side test Power supply weight (kg) Secondary side test Power supply test current (A) Secondary side test Power supply test voltage (V) Secondary side test Power supply capacity (VA) Secondary side test Power supply input voltage Secondary side test Resistance box (lid) Weight (kg) Secondary side test Resistance box (lid) Resistance value (mΩ) Secondary side test Resistance box (lid) Capacity (W) Secondary side test Resistance box (lid) Cooling fan Secondary side test Resistance box (lid) Case size Secondary side test cable (power supply to specimen) Weight (kg) Secondary side test cable (power supply to specimen) specifications Primary side test Power supply weight (kg) Primary side test Power supply test current (A) Primary side test Power supply test voltage (V) Primary side test Power supply capacity (VA) Primary side test Power supply input voltage Primary side test Power supply size Primary side test Power cable weight (kg) Primary side test power cable specifications Primary side test cable weight (kg) Primary side test cable specifications Cable (specimen to resistance) Weight (kg) Cable (specimen to resistance) specifications
Power generation and substation main circuit primary energization test equipment CVE-22-Part Number-CVE-22

CVE-22

Available upon quote

Can measure output current R, S, T Measurement accuracy ±1%

Can measure output voltage RN, SN, TN, RS, ST, TR Measurement accuracy ±1%

Phase measurement of any combination of input voltage RN, SN, TN, RS, ST, TR and output current R, S, T is possible. Measurement accuracy is ±3° (provided that the output current is 30% or more of the rated value).

(combined with primary side test)

20

5

200 (dedicated protection circuit required)

Three-phase AC 200V 50Hz

4.6 (included in power supply)

100

200

Yes (DC24V-4.2W)

D262×W372×H120 (mm)

3.5

3PNCT (3 core) 5.5mm2-7m

25 (including resistance box)

8.3, 4.1, 2, 1

2550100200

360

Three-phase AC 200V 50Hz

D262×W372×H290 (mm)

8.8

VCT 2.0mm2-3C-30m (drum type)

2.6

VCT 3.5mm2-4C-5m

3.5

3PNCT (3 core) 5.5mm2-7m

Other products of CB Engineering Co., Ltd.

Reviews shown here are reviews of companies.


View more products of CB Engineering Co., Ltd.

About Company Handling This Product

Response Rate

100.0%


Response Time

3.7hrs

  • Japan

This is the version of our website addressed to speakers of English in the United States. If you are a resident of another country, please select the appropriate version of Metoree for your country in the drop-down menu.

Copyright © 2025 Metoree