All Categories
History
Response Rate
100.0%
Response Time
94.2hours
Product
Expansion joint cover for earthquake-resistant structures S series stainless steel standard seriesHandling Company
Inoue Shoji Co., Ltd.Click on the part number for more information about each product
Image | Part Number | Price (excluding tax) | Part name | Surface finish | Material |
---|---|---|---|---|---|
![]() |
Stainless steel standard series floor |
Available upon quote |
SF cover, SFC cover, SL cover, corner cap |
SF cover/SFC cover: GP-1 (crest 2B, valley 2D) Finish |
SUS304 specified in JIS G4305 |
![]() |
Stainless steel standard series Exterior walls, ceilings, interior walls |
Available upon quote |
Cover/corner cover |
SF cover/SFC cover: GP-1 (crest 2B, valley 2D) Finish |
SUS304 specified in JIS G4305 |
![]() |
Stainless steel standard series roof |
Available upon quote |
Cap |
SF cover/SFC cover: GP-1 (crest 2B, valley 2D) Finish |
SUS304 specified in JIS G4305 |
![]() |
Stainless steel standard series floor 2 |
Available upon quote |
Frame/corner frame |
- |
Hot-dip galvanized steel sheets and steel strips (ZAM) specified in JIS G3323 |
![]() |
Stainless steel standard series floor 3 |
Available upon quote |
Frame/Corner Cap/Corner Frame |
[Electrolytic coloring] |
A6063S-T5 specified in JIS H4100 |
![]() |
Stainless steel standard series Exterior walls, ceilings, interior walls 2 |
Available upon quote |
Cap |
[Electrolytic coloring] |
A6063S-T5 specified in JIS H4100 |
![]() |
Stainless steel standard series roof 2 |
Available upon quote |
Connecting material, RW frame, RCW frame cover, RCW frame, aluminum angle |
[Electrolytic coloring] |
A6063S-T5 specified in JIS H4100 |
![]() |
Stainless steel standard series Exterior walls, ceilings, interior walls 3 |
Available upon quote |
Joint plate/seat holder |
[Electrolytic coloring] |
A1100P-H14 specified in JIS H4000 |
Click on the part number for more information about each product
Reviews shown here are reviews of companies.
Response Rate
100.0%
Response Time
94.2hrs