All Categories

History

Metal plate and bolt join Abex by the Kashime construction method-Abex
Metal plate and bolt join Abex by the Kashime construction method-Topura Co., Ltd.

Metal plate and bolt join Abex by the Kashime construction method
Topura Co., Ltd.

Topura Co., Ltd.'s Response Status

Response Rate

100.0%

Response Time

13.2hours

Relatively Fast Response


About This Product

■ Characteristics

It is a product in which metal plate and bolt are joined by the kashime method.

■ Advantages

It is possible to reduce the accuracy of variations and the like than welding methods. Since it is not welded, it is possible to join a high -strength bolt that is susceptible to heat.

■ How to use

The part where the bolt is fastened by the welding and sticking method. Parts that you want to join high bolts.

  • Product

    Metal plate and bolt join Abex by the Kashime construction method

Share this product


140+ people viewing

Last viewed: 8 hours ago


Free
Get started with our free quotation service - no cost, no obligation.

No Phone Required
We respect your privacy. You can receive quotes without sharing your phone number.

1 Models of Metal plate and bolt join Abex by the Kashime construction method

Image Part Number Price (excluding tax) size
Metal plate and bolt join Abex by the Kashime construction method-Part Number-Abex

Abex

Available upon quote

M5 ~ M16

Other products of Topura Co., Ltd.

Reviews shown here are reviews of companies.


View more products of Topura Co., Ltd.

About Company Handling This Product

Response Rate

100.0%


Response Time

13.2hrs

  • Japan

This is the version of our website addressed to speakers of English in the United States. If you are a resident of another country, please select the appropriate version of Metoree for your country in the drop-down menu.

Copyright © 2024 Metoree