All Categories

History

Even if applied to the wall, it is difficult to hang down, which is difficult to work and industrial repair material strong rubber putty NEO-Strong rubber putty NEO
Even if applied to the wall, it is difficult to hang down, which is difficult to work and industrial repair material strong rubber putty NEO-Kansai Patate Kako Co., Ltd.

Even if applied to the wall, it is difficult to hang down, which is difficult to work and industrial repair material strong rubber putty NEO
Kansai Patate Kako Co., Ltd.

Kansai Patate Kako Co., Ltd.'s Response Status

Response Rate

100.0%

Response Time

5.4hours

Very Fast Response


About This Product

Since the viscosity of the main agent and curing agent is lower than before, it is easy to mix, it changes into a paste in 1-2 minutes, and it is difficult to hang down to the wall, making it difficult to work. If it hardens, it will change to a rubber with a tough stretch and adhere to metal, rubber, stone, etc.

■ Use

・ Repair the flesh of equipment that operates, such as javaras, in which the rubber belt conveyor is exposed due to deterioration and repairs the rubber damage portion to its original shape. ・ Protection of aspects exposed to wear (impact) such as shots. ・ Lining to prevent noise of parts feeders. ・ Repair of the device with vibration, such as the oil leakage of the transformer, etc.

■ Main applicable equipment

・ Repair of rubber parts such as Belcon and javaras ・ Recovery of airtightness of butterfly valve and manhole ・ Piping, flange, box, etc. with vibration ・ Equipment in which metal and metal collide with parts feeders, etc. to generate noise ・ Pumps, shoots, centrifugal separators, etc. ・ (Rubber) Repaired rubber parts such as belt conveyors and javaras ・ Protection lining on the surface exposed to wear (impact) such as shots ・ Protection lining to prevent noise such as parts feeders ・ Repair leakage of equipment that vibrates, etc. ・ Adhesion application of rubber (may not be able to adhere depending on the type of rubber you want to bond)

■ Precautions for storage

Strong rubber putty NEO main agents tend to be transformed (cloudy → hardened) in response to moisture, so use up after opening.

■ Product features

・ If it hardens properly, it will adhere to metal and rubber and become a strong and stretchy rubber shape. ・ When the main agent and the curing agent are mixed, it changes into a paste, making it difficult to hang on the wall. ・ Suitable for repairing rubber products ・ Show resistance to impact and can be protected by maternal material ・ Rubber performance after curing has noise reduction performance during object collisions.

  • Product

    Even if applied to the wall, it is difficult to hang down, which is difficult to work and industrial repair material strong rubber putty NEO

Share this product


270+ people viewing

Last viewed: 19 hours ago


Free
Get started with our free quotation service - no cost, no obligation.

No Phone Required
We respect your privacy. You can receive quotes without sharing your phone number.

1 Models of Even if applied to the wall, it is difficult to hang down, which is difficult to work and industrial repair material strong rubber putty NEO

Image Part Number Price (excluding tax) Applied area M^2 (5mm thickness) Hypotherlycar Hardness shore -D Heat -resistant temperature ℃ Packing Tensile intensity MPA Tack -free part Growth rate % Frequency strength N/mm Pulling shear adhesive intensity MPA Available hours Holding time Heatproof temperature time Viscosity MPA / S Color -like appearance Combination ratio weight ratio (WT.) Combination ratio volume ratio (vol.)
Even if applied to the wall, it is difficult to hang down, which is difficult to work and industrial repair material strong rubber putty NEO-Part Number-Strong rubber putty NEO

Strong rubber putty NEO

Available upon quote

0.118

1.02

80

80

0.6kg (main agent: 0.54kg, hardening agent: 0.06kg, tree hela)

10 ~ 14

30-40

400 ~ 450

52 ~ 59

6.2 (aggregate destruction), 0.6 (interface peeling)

6 ~ 9

7-10

80 degrees (DRY)

O use time: 3-5 minutes, curing time: 4 hours

Main agent: 20,000-24,000/curing agent: 200-220, high viscosity paste

Main drug: Yellow transparent/curing agent: black

Main drug 9/hardening agent 1

Main drug 9/hardening agent 1

Customers who viewed this product also viewed

Reviews shown here are reviews of companies.

See More Caulking Products

Other products of Kansai Patate Kako Co., Ltd.

Reviews shown here are reviews of companies.


View more products of Kansai Patate Kako Co., Ltd.

About Company Handling This Product

Response Rate

100.0%


Response Time

5.4hrs


Company Review

4.0
  • Japan

This is the version of our website addressed to speakers of English in the United States. If you are a resident of another country, please select the appropriate version of Metoree for your country in the drop-down menu.

Copyright © 2025 Metoree