All Categories
History
Response Rate
100.0%
Response Time
50.0hours
Product
Steam boiler Small-scale furnace tube boiler MP MINY seriesHandling Company
Hirakawa Co., Ltd.Categories
Image | Part Number | Price (excluding tax) | LPG (m3N/h) | LPG boiler efficiency | Burner model | Boiler type | Heat transfer area (m2) | Type of fuel used | Power supply used (50/60Hz) | Handler qualification | Safety valve outlet | Dimensions (mm) | Normal working pressure (MPa) | Water capacity during regular use (ℓ) | Drainage outlet | Converted evaporation amount (kg/h) | Maximum working pressure (MPa) | Water capacity when full (ℓ) | Thermal power (kW) | Fuel supply pressure (kPa) | Fuel inlet | Combustion control method | Water supply inlet | Steam outlet | Product dry weight (kg) | Equipment power (kW) | City gas 13A (m3N/h) | City gas 13A boiler efficiency |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
MINY-600SZ Gas |
Available upon quote |
21.3 |
88 |
Pre-mixing type |
Boiler (small boiler) |
4.9 |
Gas |
AC200V 3 phase |
Those who have completed boiler handling skills training or above |
32 |
Equipment total length (approximate): 2,430 |
0.49 or more |
400 |
Twenty five |
750 |
0.98 |
600 |
470 |
City gas medium pressure B (98.1~294) |
40 |
Proportional combustion |
32 |
50 |
3,000 |
6.2 |
47.4 |
88 |
Reviews shown here are reviews of companies.
Reviews shown here are reviews of companies.
Response Rate
100.0%
Response Time
50.0hrs