All Categories
History
Product
Hydro staffHandling Company
Aizawa High Pressure Concrete Co., Ltd.Categories
Image | Part Number | Price (excluding tax) | Visual inspection inside the storage tank | Porosity | Minimum soil cover | Maximum reservoir height | Maximum depth (including earth cover) | Maximum soil cover | Maintenance |
---|---|---|---|---|---|---|---|---|---|
Hydro staff |
Available upon quote |
Visual inspection inside the tank is possible |
95% or more |
0.5m |
2.4m (6 tiers) |
4.3m |
2.0m |
The inside of the tank can be cleaned |
Reviews shown here are reviews of companies.
Reviews shown here are reviews of companies.