All Categories

History

Hydro staff-Hydro staff
Hydro staff-Aizawa High Pressure Concrete Co., Ltd.

About This Product

■POINT.1 Sediment control system

A sediment control system is a system that uses partitions to prevent inflowing sediment from spreading. Since the inside of the partition can be cleaned, the storage tank function can be maintained for a long period of time. *This system is optional. 1. Locally settle sediment. 2. People can come inside and clean. 3.More than 90% sediment control effect. (※) (*) The numerical values ​​for the sedimentation control effect are data from the witnessed test at the time of obtaining the construction technology examination certificate, and are not guaranteed values.

■ Concept of “sediment control system”

When rainwater flows into a storage tank, it is common for the inflow tank to be managed immediately before sand particles that are too small to be removed by the inflow tank can be removed. This system was developed to collect in one place small-sized sand that cannot be removed by the inflow tank, which enters the storage tank, and to clean the inside of the tank.

■POINT.2 Excellent seismic performance. Also compatible with large storage tanks.

Because Hydrostaff assembles the storage tank in a staggered and joint-less manner, it has excellent shear properties, and the allowable storage tank width, assuming a level 2 earthquake, is one of the best in the industry. *Calculated based on "Plastic Rainwater Pond Underground Storage and Infiltration Technology Manual | Seismic Performance Test"

■POINT.3 The inside of the storage tank can be visually checked.

Hydrostaff uses a pillar structure. Therefore, a large amount of space can be taken up inside the storage tank.

■Features of Hydro Staff

The Hydrostaff system is a system that combines polypropylene units and sheets to store or infiltrate rainwater underground to create rainwater utilization and rainwater runoff control facilities. 1.Compact: porosity 95% or more 2. Short construction period: 100 tons can be assembled in one day 3.Strong: T-25 load compatible 4. Maintenance: Over 90% sediment control effect in the tank Sediment control system (optional) 5.Large storage tank: Up to 47,000 tons possible 6.Excellent seismic performance: Compatible with level 2 earthquakes 7. Great design freedom: Free shape/Storage tank size starting from 423 mm (1 stage)

  • Product

    Hydro staff

Share this product


10+ people viewing


Free
Get started with our free quotation service - no cost, no obligation.

No Phone Required
We respect your privacy. You can receive quotes without sharing your phone number.

1 Models of Hydro staff

Image Part Number Price (excluding tax) Visual inspection inside the storage tank Porosity Minimum soil cover Maximum reservoir height Maximum depth (including earth cover) Maximum soil cover Maintenance
Hydro staff-Part Number-Hydro staff

Hydro staff

Available upon quote

Visual inspection inside the tank is possible

95% or more

0.5m

2.4m (6 tiers)

4.3m

2.0m

The inside of the tank can be cleaned

Customers who viewed this product also viewed

Reviews shown here are reviews of companies.

See More Structural Materials Products

Other products of Aizawa High Pressure Concrete Co., Ltd.

Reviews shown here are reviews of companies.


View more products of Aizawa High Pressure Concrete Co., Ltd.

About Company Handling This Product

This is the version of our website addressed to speakers of English in the United States. If you are a resident of another country, please select the appropriate version of Metoree for your country in the drop-down menu.

Copyright © 2024 Metoree