All Categories
History
Product
Broadcast network equipment AC normal charger for EV/PHEV AC normal charger checker for EV/PHEV HEV-CHK001Handling Company
HIRAKAWA HEWTECH CORP.Categories
Image | Part Number | Price (excluding tax) | Power input | Applicable standards | Mass | Display LED | Displayability 7 segments | Environmental specifications Operating temperature/humidity | Environmental specifications Storage temperature/humidity | Attached items | Function vehicle type switching function | Function Earth leakage generation function | Function Charging voltage display function | Function charger test function | Function test mode switching function | Function Auto power off function | Maximum power consumption | Operability push button | External dimensions |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
HEV-CHK001 |
Available upon quote |
Battery (006P type 9V) or AC adapter (sold separately) |
IEC61851-1, SAEJ1772 |
740g (including battery) |
LED displays power status, test status, and error status |
Displays error code as a number when an error occurs |
0~40℃/20~80% (no condensation) |
0~60℃/20~90% (no condensation) |
1 instruction manual, 1 warranty, 1 battery |
Mode 3 vehicle: Simulates a vehicle that has an authentication function using CPLT signals, Mode 1 vehicle: Simulates a vehicle that does not have an authentication function using CPLT signals *Mode 1 test mode is only AUTO |
Generate a leakage during the test and check the earth leakage interrupting operation on the EV normal charger side (generate a leakage current of 30mA for 150ms) |
Determine charging voltage (AC100/200V) and display on LED |
The test is performed in 3 steps, the test results are displayed on the LED, and the error details can be confirmed using the error code number displayed on 7 segments [Test steps] Step 1: Connect the gun Step 2: Charge Step 3: Remove the gun |
AUTO mode: Automatically confirms the entire series of charging operations by pressing the start button, STEP mode: Confirms the operation of the charger step by step based on requests from the charging control device. |
Power off approximately 3 minutes after the last operation. Notification by flashing power LED 30 seconds before power off |
0.8W |
Operate with buttons when selecting power, start, stop, test, vehicle type, and earth leakage. |
W: 72mm D: 271.5mm H: 72mm |
Reviews shown here are reviews of companies.
Reviews shown here are reviews of companies.