All Categories

History

Large split box culvert-Large split box culvert
Large split box culvert-Nippon Kogyo Co., Ltd.

Large split box culvert
Nippon Kogyo Co., Ltd.


About This Product

■2 divisions

The upper and lower blocks are produced separately and assembled on-site, making it ideal for small rivers and road crossings. Unlike bridges, they are supported by wide base slabs, reducing costs.

■4 divisions

This is a precast box culvert consisting of four members: top slab, side walls, and bottom slab. Large sections can be constructed economically and the construction period can be significantly shortened.

■4-division assembly process

1. Placing the foundation concrete → 2. Installing the bottom slab → 3. Assembling the left side wall → 4. Assembling the right side wall → 5. Assembling the top slab → 6. Installation completed

  • Product

    Large split box culvert

Share this product


20+ people viewing


Free
Get started with our free quotation service - no cost, no obligation.

No Phone Required
We respect your privacy. You can receive quotes without sharing your phone number.

1 Models of Large split box culvert

Image Part Number Price (excluding tax)
Large split box culvert-Part Number-Large split box culvert

Large split box culvert

Available upon quote

Other products of Nippon Kogyo Co., Ltd.

Reviews shown here are reviews of companies.


View more products of Nippon Kogyo Co., Ltd.

About Company Handling This Product

This is the version of our website addressed to speakers of English in the United States. If you are a resident of another country, please select the appropriate version of Metoree for your country in the drop-down menu.

Copyright © 2024 Metoree