All Categories

History

Power receiving and substation equipment cubicle-Cubicle
Power receiving and substation equipment cubicle-JEL SYSTEM CO,LTD.

Power receiving and substation equipment cubicle
JEL SYSTEM CO,LTD.

JEL SYSTEM CO,LTD.'s Response Status

Response Rate

100.0%

Response Time

15.8hours

Relatively Fast Response


About This Product

■We will solve any problems you may have with cubicles.

・I want to review the security inspection cost ・I want to reduce demand (basic charges) ・Although repairs have been pointed out, no electrical problems have occurred. ・I doubt whether cubicles are necessary in the first place. service

■Review of safety inspection costs

We recommend installing an "insulation monitoring device" ・By installing a monitoring device, the frequency of inspections by the chief engineer can be changed from monthly to bimonthly, reducing inspection costs by reducing the frequency of inspections. ・Since the monitoring device has an insulation measurement function, it can be monitored remotely 24 hours a day, improving safety and allowing early response in the event of trouble. You can also compare renewal costs.

■Suppression of demand (reduction of basic charges)

We recommend installing a "demand monitoring device" and "air conditioning control" ・Visualize demand every 30 minutes by installing a demand monitoring device. Alerts you when the demand is about to exceed the set value (target value) ・By installing the air conditioning control "Jel-con", the outdoor air conditioner unit is operated intermittently for 3 minutes every 30 minutes. Achieving suppression of air conditioning demand

■Lower pressure (switching from high-voltage contract to low-voltage contract)

We recommend installing an "electronic breaker" - Check the current usage status (type of equipment and current value of each equipment) and determine the necessity of cubicles. ・If it is determined that a cubicle is unnecessary, we will install an electronic breaker, optimize the basic charge, and then carry out construction to lower the voltage. ・Reducing monthly safety inspection costs and periodic cubicle repair costs to 0 yen, realizing electricity usage that is appropriate for the current situation.

■Cubicle renovation and renewal work

Periodic renovation and update work is recommended. ・Cubicles also have a service life, and if you continue to use equipment that has exceeded its service life, it may cause an electrical accident. ・There are various devices inside the cubicle, but it is recommended that each device be replaced after approximately 15 years. ・We can handle everything from partial repair work to areas pointed out by the chief engineer to renewal work for a complete set of cubicles.

■Flow of implementation

01 Current situation analysis 02 Measurement work 03 Proposal work 04 Contract 05 Equipment construction 06 Acceptance inspection 07 Business information

  • Product

    Power receiving and substation equipment cubicle

Share this product


130+ people viewing

Last viewed: 16 hours ago


Free
Get started with our free quotation service - no cost, no obligation.

No Phone Required
We respect your privacy. You can receive quotes without sharing your phone number.

1 Models of Power receiving and substation equipment cubicle

Image Part Number Price (excluding tax)
Power receiving and substation equipment cubicle-Part Number-Cubicle

Cubicle

Available upon quote

Customers who viewed this product also viewed

Reviews shown here are reviews of companies.

See More Control Panels Products

Other products of JEL SYSTEM CO,LTD.

Reviews shown here are reviews of companies.


View more products of JEL SYSTEM CO,LTD.

About Company Handling This Product

Response Rate

100.0%


Response Time

15.8hrs

  • Japan

This is the version of our website addressed to speakers of English in the United States. If you are a resident of another country, please select the appropriate version of Metoree for your country in the drop-down menu.

Copyright © 2025 Metoree