Petroleum/plant related Split foundation allows for large tanks Oil tank guard (precast assembly method) TOSF-18-TOSF-18
Petroleum/plant related Split foundation allows for large tanks Oil tank guard (precast assembly method) TOSF-18-Tamada Co., Ltd.

Petroleum/plant related Split foundation allows for large tanks Oil tank guard (precast assembly method) TOSF-18
Tamada Co., Ltd.

Tamada Co., Ltd.'s Response Status

Response Rate

100.0%

Response Time

169.9hours


About This Product

The precast construction method significantly shortens the construction period and reduces the risk of accidents.

■Simple construction

There is no need for special construction methods or equipment, such as tension work using prestressed steel or grout pumping. This is a concrete foundation that can be assembled on site using the precast construction method. By minimizing the amount of on-site construction compared to conventional on-site concrete pouring, we have significantly shortened the construction period and reduced the risk of accidents. We ensure the high quality and durability unique to precast. In addition, by adopting a split type, it can also be used for large tanks. With conventional construction methods, there are concerns...

■Due to weather conditions, excavation continues...

With conventional construction methods, the construction period can be significantly delayed due to weather conditions. As excavation continues, the level of danger increases.

■Collapse of excavation hole...

Prolonging the construction period while the excavation remains in place can cause the collapse of nearby buildings and houses, as well as the collapse of roads and rivers.

■Falling into an excavated hole...

There is a high risk of accidental falls from workers, people walking nearby, and children who use it as a playground.

■Concrete quality deteriorates depending on the season...

During periods of heavy rain and snow, concrete is difficult to harden, leading to delays in construction.

■Shorter construction period

Oil tank guards can be installed in 5 days. (Including oil tank installation, backfilling, and piping installation) The frame construction time is approximately 1/8 of that of conventional cast-in-place concrete construction, making it possible to significantly shorten the overall construction period.

  • Product

    Petroleum/plant related Split foundation allows for large tanks Oil tank guard (precast assembly method) TOSF-18

Share this product


70+ people viewing


Free
Get started with our free quotation service - no cost, no obligation.

No Phone Required
We respect your privacy. You can receive quotes without sharing your phone number.

1 Models of Petroleum/plant related Split foundation allows for large tanks Oil tank guard (precast assembly method) TOSF-18

Image Part Number Price (excluding tax) Oil tank guard (precast construction method) Product weight SF double shell tank (public building equipment specifications) inner diameter SF double shell tank (public building equipment specifications) total length SF double shell tank (public building equipment specification) Kg weight SF double shell tank (public building equipment specifications) KL capacity
Petroleum/plant related Split foundation allows for large tanks Oil tank guard (precast assembly method) TOSF-18-Part Number-TOSF-18

TOSF-18

Available upon quote

35,085kg

Φ1,900mm

7,010mm

3,710kg

18KL
Tank capacity is straight.

Other products of Tamada Co., Ltd.

Reviews shown here are reviews of companies.


View more products of Tamada Co., Ltd.

About Company Handling This Product

Response Rate

100.0%


Response Time

169.9hrs

  • Japan

This is the version of our website addressed to speakers of English in the United States. If you are a resident of another country, please select the appropriate version of Metoree for your country in the drop-down menu.

Copyright © 2024 Metoree