All Categories
History
Response Rate
100.0%
Response Time
72.6hours
Product
Ganpt / Basic Piles MGA-S seriesHandling Company
Lipton EnergyClick on the part number for more information about each product
Image | Part Number | Price (excluding tax) | Corresponding basis | Wind resistance | Snow -resistant snow | Module installation angle | Module placement direction | Gantry material | Bolt nut material | Design standards | Accessories / Others |
---|---|---|---|---|---|---|---|---|---|---|---|
MGA-SⅠ standard type |
Available upon quote |
Pile / concrete |
Standard 34m/s maximum 55m/s |
Standard 50cm maximum 80cm |
East and west 0 ° north -south 0 ° to 35 ° |
Sideways |
Aluminum alloy (alumite processing) AL6005-T5 |
SUS304 |
JISC8955: 2017AS/NZS1170DIN1055 |
Panel earth plate |
|
MGA-SⅡ reinforced type |
Available upon quote |
Pile / concrete |
Standard 36m/s maximum 55m/s |
Standard 80cm maximum 150cm |
East and west 0 ° north -south 0 ° to 35 ° |
Sideways |
Aluminum alloy (alumite processing) AL6005-T5 |
SUS304 |
JISC8955: 2017AS/NZS1170DIN1055 |
Panel earth plate |
|
MGA-SⅢ inclined type |
Available upon quote |
Pile |
Standard 34 m/s maximum 42m/s |
Standard 30cm maximum 100cm |
East and west 0 ° to 30 ° north -south 0 ° to 30 ° |
Sideways |
Aluminum alloy (alumite processing) AL6005-T5 |
SUS304 |
JISC8955: 2017AS/NZS1170DIN1055 |
Panel earth plate |
|
Simple carport |
Available upon quote | - |
34 m/s |
Up to 80cm |
0 degrees to 15 degrees |
Sideways |
Aluminum alloy (alumite processing) AL6005-T5 |
SUS304 |
JISC8955: 2017AS/NZS1170DIN1055 |
- |
Click on the part number for more information about each product
Reviews shown here are reviews of companies.
Response Rate
100.0%
Response Time
72.6hrs