All Categories
History
Price (excluding tax)
Response Rate
100.0%
Response Time
18.2hours
Relatively Fast Response
■ 50R (f) -100AL / 50R (f) -150AL installation 1 Fix the deputy with the attached drill screw to match the highest floor level. If the level of the floor is extremely bad, cut the deputy body and body short and use it according to the floor. 2 Insert the protrusion of the main unit into the "main body insertion portion" of the vice body, and fix the R stroke body. 3. Seal the gaps with the r -stroked body with caulking.
You can search for other models from each index. The displayed value is the value of the currently selected part number.
Corner
End of the end
Finishing
Installation method
Material
Shipment form
Standard scale
Stock status
color
Part Number
50R-100ALProduct
Aluminum R strokeHandling Company
Sun Wise Co., Ltd.Categories
Image | Price (excluding tax) | Corner | End of the end | Finishing | Installation method | Material | Shipment form | Standard scale | Stock status | color |
---|---|---|---|---|---|---|---|---|---|---|
![]() |
Available upon quote | Made of nylon resin | ABS resin molding | Antibacterial alumite clear processing | Hook and fix it to the screwed vice body | Aluminum | Shipment on a fixed scale | 3,000mm | Standard stock | Silver |
Reviews shown here are reviews of companies.
Reviews shown here are reviews of companies.
Response Rate
100.0%
Response Time
18.2hrs