All Categories
History
Price (excluding tax)
■How to install the switch ① Attach so that the magnet is on the sensitive side. ② Check the actual operating position before installing. ③ Be sure to place the switch in a holder, etc., and do not tighten it directly with screws, etc. ④ Mount it on a non-magnetic material.
You can search for other models from each index. The displayed value is the value of the currently selected part number.
Contact
Contact capacity
Lead wire
Leakage current
Load current
Load voltage
Operating temperature range
Operation indicator light
Protection circuit
Protective structure
Sensitivity value
Shockproof
Vibration resistance
Voltage drop when closed circuit
Wiring method
Part Number
SWK-1Handling Company
JPN Co., Ltd.Categories
Image | Price (excluding tax) | Contact | Lead wire | Leakage current | Load current | Load voltage | Operating temperature range | Operation indicator light | Protection circuit | Protective structure | Sensitivity value | Shockproof | Vibration resistance | Voltage drop when closed circuit | Wiring method |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
Available upon quote | Non-contact | Bending-resistant, heat-resistant, oil-resistant vinyl sheath instrumentation cable (PCCV ODφ3, 0.2SQ x 2 cores x length = 1m (standard), 5m) | 1mA | 4~50mA | SC10~28V | 0~60℃ | LED lights up (red) when ON | Built-in pulse overvoltage protection circuit, reverse connection protection circuit, surge absorption circuit, output short circuit protection circuit | IP67G (IEC standard), JISC0920 (dust-proof/immersion-proof type) | 5mT or more | 30 G (non-repetitive) | 9 G (total amplitude 1.5mm10~55 Hz) | 3.5V or less | 2 wire system |
Reviews shown here are reviews of companies.
Reviews shown here are reviews of companies.