All Categories
History
Price (excluding tax)
■How to install the switch ①Fold the band from the screw fitting part. ② Attach the switch to the top of the cylinder and move the screw part to near the 90° position of the switch. *Hang the band on the metal fitting on the bottom of the switch. ③ Insert the ○+ screw from the concave metal fitting and screw it into the mating metal fitting. ④If the switch is fixed and does not move, it is OK.
You can search for other models from each index. The displayed value is the value of the currently selected part number.
Contact
Contact capacity
Lead wire
Leakage current
Load current
Load voltage
Operating temperature range
Operation indicator light
Protection circuit
Protective structure
Sensitivity value
Shockproof
Vibration resistance
Voltage drop when closed circuit
Wiring method
Part Number
SWC-1Handling Company
JPN Co., Ltd.Categories
Image | Price (excluding tax) | Contact | Contact capacity | Lead wire | Leakage current | Load current | Load voltage | Operating temperature range | Operation indicator light | Protection circuit | Protective structure | Sensitivity value | Shockproof | Vibration resistance | Voltage drop when closed circuit | Wiring method |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
Available upon quote | Contact point | AC/DC10VA | Bending-resistant, heat-resistant, oil-resistant vinyl sheathed instrumentation cable (PCCV ODφ3.5 0.2SQ x 2 cores (blue, brown) x length = 1m (standard), 5m) | 0mA | 5~50 mA | AC/DC10~100V | -10~60℃ | LED lights up when ON (green, red) 1A (OFF Set) | None | IP67G (IEC standard) | 5mT or more | 30G (11 msec) | 20G (10~1,000Hz) | 4V or less | 2 wire system |
Reviews shown here are reviews of companies.
Reviews shown here are reviews of companies.