All Categories
History
Price (excluding tax)
Response Rate
100.0%
Response Time
146.4hours
You can search for other models from each index. The displayed value is the value of the currently selected part number.
Body length
Body outer diameter
Burner electric motor 50Hz/60Hz
Burner height
Burner length
Cradle length
Cradle position
Exhaust port height
Exhaust port location
Fuel
Full width
Laws and regulations Operator qualifications
Laws and regulations Structural standards
Outer diameter of exhaust port
Overall height
Pedestal width
Performance Actual evaporation kg/h
Performance Boiler efficiency %
Performance Calorific value kcal/h
Performance Equivalent evaporation amount (kg/h)
Performance Fuel consumption L/h
Performance Full water volume L
Performance Heat transfer area m^2
Performance Maximum working pressure MPa
Performance Operating water volume L
Product weight kg
Regulations Installation notification
Legislation Air Pollution Control Act
Regulations Completion inspection
Regulations Performance inspection
Part Number
NB2400Product
NB boiler seriesHandling Company
Nippon Kikan Co., Ltd.Image | Price (excluding tax) | Body length | Burner electric motor 50Hz/60Hz | Burner height | Cradle length | Cradle position | Exhaust port height | Exhaust port location | Fuel | Full width | Laws and regulations Operator qualifications | Laws and regulations Structural standards | Legislation Air Pollution Control Act | Outer diameter of exhaust port | Overall height | Pedestal width | Performance Actual evaporation kg/h | Performance Boiler efficiency % | Performance Calorific value kcal/h | Performance Equivalent evaporation amount (kg/h) | Performance Fuel consumption L/h | Performance Full water volume L | Performance Heat transfer area m^2 | Performance Maximum working pressure MPa | Performance Operating water volume L | Product weight kg | Regulations Completion inspection | Regulations Installation notification | Regulations Performance inspection |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
Available upon quote | 2,845 | 3.7 | 1,214 | 2,500 | 230 | 2,330 | 365 | Recycled oil | 2,336 | Persons who have completed boiler handling skills training | Ministry of Health, Labor and Welfare Notification “Structural Standards for Boilers and Pressure Vessels” | Submit smoke generating facility notification form (at the time of installation)/Measurement (once/year) | Φ440 | 3,160 | 1,000 | 2,011 | 99 | 1,293,600 | 2,400 | 149.3 | 510 | 27.99 | 0.981 | 410 | 4,300 | Inspection experiment by the Director of Labor Standards Inspection (at the time of installation) | Establishment notification (submitted to Labor Standards Inspection Office) | Inspection experiment by the Director of Labor Standards Inspection (once/year) |
Reviews shown here are reviews of companies.
Response Rate
100.0%
Response Time
146.4hrs