All Categories
History
Price (excluding tax)
Response Rate
100.0%
Response Time
16.6hours
Relatively Fast Response
■Features ・When performing construction using the generator construction method or bypass construction method, construction cables can be connected without stripping the insulation of high-voltage distribution lines, reducing the number of work hours. - Connections can be made by simply tightening with a small force using an operating rod with a torque limiter. *Easier to work on pillars -Can carry a current of 135A (bypass cable: equivalent to 6kV CV 22㎡). - By connecting our temporary support rod to the temporary support rod connection part, the clamp can be temporarily supported on the power distribution line. ・Since only one hole of about 5 mm is made in the distribution line, insulation repair after construction is easy.
You can search for other models from each index. The displayed value is the value of the currently selected part number.
Ambient temperature
Ambient temperature weather
Connection torque
Rated current
Rated voltage
Part Number
High pressure needle electrode clamp 135AHandling Company
Daiden Co., Ltd.Categories
Image | Price (excluding tax) | Ambient temperature | Ambient temperature weather | Connection torque | Rated current | Rated voltage |
---|---|---|---|---|---|---|
![]() |
Available upon quote | -20~40℃ | All weather | 7.84N・m | 135A | 6,600V |
Reviews shown here are reviews of companies.
Reviews shown here are reviews of companies.
Response Rate
100.0%
Response Time
16.6hrs