Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-HCE-500D
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-HCE-500B
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-HCE-600S
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-HCE-900S
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-HCE-900B
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-HCE-N990B
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-HCE-990B
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Sanoyas engineering Co., Ltd.

Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment
Sanoyas engineering Co., Ltd.


About This Product

A construction elevator that works for workers and materials as the center of on -site lift equipment in large projects and redevelopments around the country. Our elevator for construction is an efficiency system that can only be done by manufacturers. ■ A wealth of models and proposals that can handle wide in all sites A wealth of models, such as one structure corresponding to high -rise building construction work, two structures used for apartment housing architecture, chimney at power plants and cleaning plants, plant facilities, and permanent elevators. We will respond to your diverse requests with proposals. ■ Do not take time to maintain / repair / procure parts In order to proceed with the work on the site more smoothly, it is a prompt response because it is a manufacturer, and it will not take time. * There are other part numbers.

  • Product

    Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment




*Please note that we may not be able to accommodate sample requests.

10 Models of Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment

Items marked with have different values ​​depending on the model number.

Click on the part number for more information about each product

Product Image Part Number Price (excluding tax) Door opening dimensions Drive system Equipment power supply Internal dimensions Maximum Movable load Operation method Rising speed Safety device Speed ​​control method Stage door format Stop Supply power supply Transer door format Turtle used kinds
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Part Number-HCE-500D

HCE-500D

Available upon quote 520 Rack / Pinion drive system Three -phase exchange 200/220V, 50/60Hz Length 1,300mm x width 1,000mm x height 2,200mm 200m (400V specification only) 500kg (maximum capacity 7 people) In -transferors manual operation operation 0.5/0.6m/s (30/36m/min) 50/60Hz Automatic fall prevention device
Emergency stop switch
Rising and down restriction limit switch
Buffer spring
Each door limit switch
Transer door automatic lock device
Over -rising device
Direct method Manual horizontal pull door Any floor Three -phase exchange 200/220V, 50/60Hz Manual horizontal pull door 5.5kw (2 units) Construction rack type elevator
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Part Number-HCE-500B

HCE-500B

Available upon quote 883 Rack / Pinion drive system Three -phase exchange 400/440V, 50/60Hz Length 1,400mm x width 945mm x height 2,100mm 200m 500kg (maximum capacity 7 people) In -transferors manual operation operation 0.5/0.6m/s (30/36m/min) 50/60Hz Automatic fall prevention device
Emergency stop switch
Rising and down restriction limit switch
Buffer spring
Each door limit switch
Transer door automatic lock device
Over -rising device
Direct method Manual 2 sheets swing door Any floor Three -phase exchange 400/440V, 50/60Hz Opening door and manual up and down door 5.5kw (2 units) Construction rack type elevator
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Part Number-HCE-600S

HCE-600S

Available upon quote 500 Pin rack drive system Three -phase exchange 200/220V, 50/60Hz Length 1,600mm x width 1,000mm x height 2,100mm 70m 600kg (maximum capacity 9 people) In -transferors manual operation operation / autonomous driving operation 0.33/0.34m/s (20/20.4m/min) 50/60Hz Automatic fall prevention device
Rising and down restriction limit switch
Emergency stop switch
Each door limit switch
buffer
Direct method Manual horizontal pull door Any floor Three -phase exchange 200/220V, 50/60Hz Manual horizontal pull door 7kw-4P Construction rack type elevator
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Part Number-HCE-900S

HCE-900S

Available upon quote 500 Pin rack drive system Three -phase exchange 200/220V, 50/60Hz Length 2,200mm x width 1,000mm x height 2,100mm 70m 900kg (maximum capacity 13 people) In -transferors manual operation operation / autonomous driving operation 0.21/0.25m/s (12.5/15m/min) 50/60Hz Automatic fall prevention device
Rising and down restriction limit switch
Emergency stop switch
Each door limit switch
buffer
Direct method Manual horizontal pull door Any floor Three -phase exchange 200/220V, 50/60Hz Manual horizontal pull door 5.5kw-4P Construction rack type elevator
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Part Number-HCE-900B

HCE-900B

Available upon quote 1188 Rack / Pinion drive system Three -phase exchange 400/440V, 50/60Hz Length 1,750mm x width 1,250mm x height 2,100mm 200m 900kg (maximum capacity 13 people) In -transferors manual operation operation 0.5/0.6m/s (30/36m/min) 50/60Hz Automatic fall prevention device
Emergency stop switch
Rising and down restriction limit switch
Buffer spring
Each door limit switch
Transer door automatic lock device
Over -rising device
Direct method Manual 2 sheets swing door Any floor Three -phase exchange 400/440V, 50/60Hz Opening door and manual up and down door 7.5kw (2 units) Construction rack type elevator
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Part Number-HCE-N990B

HCE-N990B

Available upon quote 1250 Rack / Pinion drive system Three -phase exchange 400/440V, 50/60Hz Length 1,900mm x width 1,250mm x height 2,050mm 200m 990kg (maximum capacity 15 people) In -transferors manual operation operation 0.42m/s (25m/min) 50/60Hz Automatic fall prevention device
Emergency stop switch
Rising and down restriction limit switch
Buffer spring
Each door limit switch
Over -rising device
Direct method Manual 2 sheets swing door Any floor Three -phase exchange 400/440V, 50/60Hz Opening door open door 9kw (2 units) Construction rack type elevator
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Part Number-HCE-990B

HCE-990B

Available upon quote 1188 Rack / Pinion drive system Three -phase exchange 400/440V, 50/60Hz Length 1,900mm x width 1,250mm x height 2,100mm 200m 990kg (maximum capacity 15 people) In -transferors manual operation operation 0.5/0.6m/s (30/36m/min) 50/60Hz Automatic fall prevention device
Emergency stop switch
Rising and down restriction limit switch
Buffer spring
Each door limit switch
Over -rising device
Direct method Manual 2 sheets swing door Any floor Three -phase exchange 400/440V, 50/60Hz Opening door open door 7.5kw (2 units) Construction rack type elevator
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Part Number-HCE-990BS (with counter weight)

HCE-990BS (with counter weight)

Available upon quote 1188 Rack / Pinion drive system Three -phase exchange 440V, 50/60Hz Length 1,900mm x width 1,250mm x height 2,100mm 200m 990kg (maximum capacity 15 people) In -transferors manual operation operation 1.5m/s (90m/min) Automatic fall prevention device
Emergency stop switch
Up and fall final Limit Switch
Up and down restriction device
Up and down deceleration device
Buffled spring / oil -filled buffer
Each door limit switch
Transer door automatic lock device
Over -rising device
Transstain barter control method, regenerative braking Manual 2 sheets swing door Any floor Three -phase exchange 400/440V, 50/60Hz Opening door and manual up and down door 16kW (2 units) Construction rack type elevator
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Part Number-HCE-990BS (no counter weight)

HCE-990BS (no counter weight)

Available upon quote 1188 Rack / Pinion drive system Three -phase exchange 440V, 50/60Hz Length 1,900mm x width 1,250mm x height 2,100mm 200m 990kg (maximum capacity 15 people) In -transferors manual operation operation 0.83m/s (50m/min) Automatic fall prevention device
Emergency stop switch
Up and fall final Limit Switch
Up and down restriction device
Up and down deceleration device
Oil -filled buffer
Each door limit switch
Transer door automatic lock device
Over -rising device
Transstain barter control method, regenerative braking Manual 2 sheets swing door Any floor Three -phase exchange 400/440V, 50/60Hz Opening door and manual up and down door 16kW (2 units) Construction rack type elevator
Elevators for construction (one structure) that can be used to transport workers and materials as the center of on -site lift equipment-Part Number-HCE-990EL (post: 670 x 400)

HCE-990EL (post: 670 x 400)

Available upon quote 4080 Rack / Pinion drive system Three -phase exchange 400/440V, 50/60Hz Length 4,150mm x width 950mm x height 2,100mm 150m 990kg (maximum capacity 15 people) In -transferors manual operation operation 0.38m/0.39m/s (22.8/23.1m/min) 50/60Hz - Direct method Manual horizontal drawing aqueon door Any floor Three -phase exchange 400/440V, 50/60Hz Electric top and bottom opening door 7.5kw-4P (2 units) Construction rack type elevator

Click on the part number for more information about each product

Customers who viewed this product also viewed

Other products of Sanoyas engineering Co., Ltd.


View more products of Sanoyas engineering Co., Ltd.

About Company Handling This Product

This is the version of our website addressed to speakers of English in the United States. If you are a resident of another country, please select the appropriate version of Metoree for your country in the drop-down menu.

Copyright © 2024 Metoree